The heightening an arch-gravity dam in Switzerland

机译:瑞士加高重力拱坝

获取原文
获取原文并翻译 | 示例

摘要

This paper describes the heightening project of a 114 m high arch-gravity dam by 23 m located in central Switzerland. The heightening of the dam is part of a larger project aimed at optimising the use of hydropower at low cost and minimum risk to investors. The existing structure presents behavioural anomalies which are related to the design and the ageing of the structure and therefore the heightening of the dam also englobes its rehabilitation leading to a dam design which fulfils both future water-retaining objectives and long-term safety requirements. Following an overview of the existing structure, the main project stages leading to the design of the heightened dam are presented. Particular attention is given to the overview project configuration, preliminary dam shape optimisation and monitoring of the structure.
机译:本文描述了位于瑞士中部的114 m高拱重力坝到23 m的加高工程。大坝的加高是旨在以低成本和对投资者最小风险优化水电利用的大型项目的一部分。现有结构的行为异常与结构的设计和老化有关,因此大坝的加高也影响了其修复工作,从而导致大坝的设计得以满足未来的保水目标和长期安全要求。在概述了现有结构之后,介绍了导致加高水坝设计的主要项目阶段。特别注意概观项目配置,初步大坝形状优化和结构监控。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号