Rehabilitation of 100 years old masonry dams in Germany

机译:修复德国100年历史的砖石水坝

获取原文
获取原文并翻译 | 示例

摘要

Around 1900 Prof. Intze designed and built about 40 masonry dams in Germany. They have a height of about 25 to 50m, are slightly curved in plan and have a sealing on the upstream face combined with a drainage curtain. Investigations in the safety of the dams showed, that at most of the dams the uplift pressure and the pore pressure was much higher than acceptable. Different solutions were developed for rehabilitation. Two of them are shown: 1. New concrete shell on the upstream face, connected to the foundation by a drainage gallery. 2. Grouting of the dam body and the foundation with cement combined with a drainage system. This consists of a blasted gallery and a new curtain of drainage borings in the dam and the foundation. The rehabilitation work has to be accompanied by the control of seepage, uplift-pressure and deformations. It is always necessary to undertake structural computations using these detailed information to verify the success of the rehabilitation.
机译:大约1900年,Intze教授在德国设计和建造了约40个砖石水坝。它们的高度约为25至50m,平面略有弯曲,并且在上游面上有密封,并带有排水帘。对大坝安全性的调查表明,在大多数大坝中,隆升压力和孔隙压力都远远高于可接受的水平。为康复开发了不同的解决方案。显示了其中两个:1.上游面上的新混凝土壳,通过排水廊连接到基础。 2.用水泥结合排水系统对坝体和基础进行灌浆。它由一处爆破的廊道以及在大坝和地基中新的排水孔组成。修复工作必须伴随着对渗流,隆起压力和变形的控制。始终有必要使用这些详细信息进行结构计算,以验证修复是否成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号