首页> 外文会议>International Structural Engineering and Construction Conference(ISEC-03); 20050920-23; Shunan(JP) >Process oriented Risk based Selection Method for innovative construction techniques - PRSM
【24h】

Process oriented Risk based Selection Method for innovative construction techniques - PRSM

机译:基于流程的创新建筑技术基于风险的选择方法-PRSM

获取原文
获取原文并翻译 | 示例

摘要

PRSM is a knowledge-based decision-making model that uses pre-structured processes to allow the interferences that occur between parallel and/or sequential elementary processes when constructing buildings and cyclically repetitive tasks to be taken into account when choosing systems (formwork, equipment concepts, etc.). For the first time, the application of this method makes it possible to clearly demonstrate the impacts of system decisions on the overall system in order to generate optimal performance and the best possible commercial benefit over the entire construction process. PRSM is, in principle, applicable to every single area of the construction industry where multiple repetitions of the same tasks occur.
机译:PRSM是基于知识的决策模型,它使用预构造的过程来允许在构建建筑物时并行和/或顺序基本过程之间发生的干扰,以及在选择系统(模板,设备概念)时要考虑周期性重复的任务等)。该方法的应用首次使它有可能清楚地说明系统决策对整个系统的影响,以便在整个施工过程中产生最佳性能和最佳商业利益。原则上,PRSM适用于建筑行业的每个重复发生相同任务的区域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号