首页> 外文会议>International Structural Engineering and Construction Conference(ISEC-03); 20050920-23; Shunan(JP) >Use of non-bridge element-level inspection data in the implementation of Bridge Management Systems (BMS)
【24h】

Use of non-bridge element-level inspection data in the implementation of Bridge Management Systems (BMS)

机译:在桥梁管理系统(BMS)的实施中使用非桥梁元素级检查数据

获取原文
获取原文并翻译 | 示例

摘要

This paper reviews effective implementation methods of bridge management systems (BMS). Database (DB) establishment involves an extensive range of data collection before system implementation. This is time consuming and costly. A method for BMS implementation using Artificial Intelligences (AI) techniques is detailed in the paper. The concept resolves insufficient historical data problems. The suggested method reduces, significantly, the time required for the implementation of BMS applications.
机译:本文回顾了桥梁管理系统(BMS)的有效实施方法。在系统实施之前,数据库(DB)的建立涉及广泛的数据收集。这是耗时且昂贵的。本文详细介绍了一种使用人工智能(AI)技术实施BMS的方法。该概念解决了历史数据不足的问题。建议的方法大大减少了BMS应用程序实施所需的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号