【24h】

Grout pressures around a tunnel lining

机译:隧道衬砌周围的灌浆压力

获取原文
获取原文并翻译 | 示例

摘要

At the rear of many tunnel boring machines an annular space is being created that has to be filled with grout. The grouting process is of importance with respect to subsurface settlements. The grouting pressures determine both the loading on the tunnel lining and the loading on the soil around the tunnel. Calculation models are presented to calculate the pressure distribution in the grout directly after the tunnel boring machine when grout flow determines the pressure and several meters from the tunnel boring machine when buoyancy forces dominate.
机译:在许多隧道掘进机的后部,正在形成一个环形空间,必须填充水泥浆。灌浆过程对于地下沉降至关重要。灌浆压力决定了隧道衬砌上的荷载和隧道周围土壤上的荷载。提出了计算模型,当灌浆流量确定压力时,可直接计算隧道掘进机后灌浆中的压力分布;当浮力占优势时,可计算出距隧道掘进机几米的压力分布。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号