首页> 外文会议>International Yellow River Forum on Keeping Healthy Life of the River vol.4; 20051021-24; Zhengzhou(CN) >Engineering Layout and Developmental Foreground Analysis of the Wuding River Area Ditch Dam Department
【24h】

Engineering Layout and Developmental Foreground Analysis of the Wuding River Area Ditch Dam Department

机译:武定河流域沟坝系工程布置及发展前景分析。

获取原文
获取原文并翻译 | 示例

摘要

The investigates of valley ditch characters indicates, that there are 6,448 ditches whose length is 0.5 ~ 1 km, 3,845 ditches whose length is 1 ~ 3 km in whole river valley. A great number of these ditches assume "U" model. The resources of setting up dam enrich. Their developmental potential is great. This paper via the on - site inspection analyses the engineering layout and developmental foreground of the WuDing river valley and provides decision - making foundation with water and soil conservation ecosystem environmental construction of the river valley.
机译:沟渠特征调查表明,全流域共有沟渠6448个,长0.5〜1 km,沟渠3845个,长1〜3 km。这些沟渠中有很多采用“ U”型。修建大坝的资源丰富。他们的发展潜力很大。本文通过实地考察,分析了武定河谷的工程布局和发展前景,为河谷水土保持生态环境建设提供了决策依据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号