Preliminary Study on Construction Scale and Project Layout of Dam System in Chengxichuan Watershed

机译:城西川流域大坝系统建设规模与工程布置初步研究。

获取原文
获取原文并翻译 | 示例

摘要

Through Systematically analyzing on the social and natural conditions, current soil erosion situation, dams construction potential, sediment reducing goal, silting land goal, the construction goal is determined as: 14 key dams, 8 medium scale and 48 small — scale silt trap dams, proportion of key dams to check dams is 1:4. According to this goal, positioning principle, thinking and schemes were put forward in further.
机译:通过对社会和自然条件,当前水土流失状况,水坝建设潜力,减淤目标,淤泥土地目标的系统分析,确定的建设目标为:14座重点水坝,8座中型和48座小型淤泥陷阱水坝,主要水坝与检查水坝的比例为1:4。根据这一目标,进一步提出了定位原则,思路和方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号