【24h】

Project Management of IT System Integration

机译:IT系统集成项目管理

获取原文
获取原文并翻译 | 示例

摘要

Which has both the general property and its own characteristics from the traditional project. At every step in implementing the system integration, the project manager should apply out his/her knowledge, technology, instrument and the technical ability all through, which means that all nine elements: the management of the entirety, of the part, of the time, the cost, the quality, the faculty, the communication, the responsibility of the risk and the perch have been integrated into the life cycle of the project to make both its general property and its distinctiveness to be evident. In this essay, initiating from the four steps of the system integration, the author introduced the staff to deliver, the milestone and juncture to pay a close attention and the controlling measure and the adoption to apply while the accident occurs in every step of IT system integration.
机译:它既具有传统项目的一般属性,又具有其自身的特征。在实施系统集成的每一步中,项目经理都应充分利用其知识,技术,手段和技术能力,这意味着要完成所有九个要素:整个时间,部分时间的管理。 ,成本,质量,师资,沟通,风险责任和栖息地已整合到项目的生命周期中,以使项目的一般属性和独特性显而易见。在本文中,作者从系统集成的四个步骤入手,介绍了在IT系统各个步骤中发生事故时要交付的人员,要紧紧关注的里程碑和时刻以及在事故发生时应采取的控制措施和采用方法。积分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号