【24h】

Modular Signalling

机译:模块化信令

获取原文
获取原文并翻译 | 示例

摘要

Two challenges for the UK railway industry are to reduce the costs and impact of engineering works. NetworkrnRail has several workstreams across the whole of Engineering aiming for the 2030 railway.rnOne project is to provide signalling support to the Modular S&C initiative where the target is for turnouts to bernrenewed in 8 hours. Facilitating the change of control from old mechanism to new and testing the installation inrn30 minutes is a challenging target. With the aid of eight graduate engineers, a method of facilitating the worksrnhas been developed and a proof of concept unit constructed.rnA bigger challenge is to enable secondary routes to be resignalled in an economic manner whilst preparingrnthem for eventual conversion to ERTMS. A project is ongoing to review the design, construction and testingrnprocesses and some ideas of what the solution might look like are included.rnThe theme of the paper is challenging the way we do things and the principles we apply, using the two projectsrnto illustrate the opportunities for young engineers to innovate.
机译:英国铁路业面临的两个挑战是降低成本和工程工程的影响。 NetworkrnRail针对整个2030年铁路工程有多个工作流程。一个项目是为模块化S&C计划提供信号支持,目标是在8小时内更新道岔。促进将控制方式从旧机制更改为新机制,并在30分钟内测试安装是一项具有挑战性的目标。在八名研究生工程师的帮助下,已经开发了一种简化工程的方法,并构建了概念验证单元。更大的挑战是,使二级路线能够以经济的方式重新签名,同时为最终转换为ERTMS做准备。一个正在进行中的项目正在审查设计,施工和测试过程,并包括一些解决方案的概念。本文的主题正在挑战我们的工作方式和所应用的原理,使用这两个项目来说明机遇让年轻的工程师进行创新。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号