【24h】

A note on determination of lead time in ordering policy

机译:关于确定订购政策中的提前期的说明

获取原文
获取原文并翻译 | 示例

摘要

In this paper, we discuss the determination of the lead time in the ordering policy with only finite minimal repairs. The state of the system failure continues between the failure after the final allowed minimal repair (system failure) and the replacement by a new unit delivered after a lead time if the system failure occurs by the delivery and otherwise the delivered unit is put into the inventory until the system failure. We apply the expected cost per unit time in the steady-state as a criterion of optimality introducing several costs, and discuss the optimal policies, i.e. the optimal lead times minimizing this expected cost. It is shown that there exists a finite and unique optimal policy under a certain condition.
机译:在本文中,我们讨论了只有有限的最小修理的订货策略中交货时间的确定。如果最终交付的设备发生系统故障,否则系统故障的状态会持续到最终允许的最低限度维修(系统故障)之后的故障与在交货时间之后交付的新单元替换之间的状态,否则将交付的单元放入库存中直到系统出现故障。我们将稳态下每单位时间的预期成本作为引入多个成本的最优性标准,并讨论了最优策略,即使该预期成本最小化的最优提前期。结果表明,在一定条件下存在一个有限唯一的最优策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号