China Steel Corporation (CSC) has four blast furnaces in operation with an average PC rate of 136-143 kg/thm with the dilute phase injection system in 2006-2007. No.4 blast furnace reached a PC rate of 151 kg/thm in February 2004, approximately 117 percent of the designed injection capacity of 45t/hr. Due to the limitation of the injection capacity of the existing system; CSC carried out a project to upgrade the injection system in 2006. The injection system of CSC No.4 blast furnace was modified to dense phase system according to the technology of KUETTNER Company in one scheduled shutdown in May 2007. Through the proper burden distribution and operational parameter adjustment, the PC rate was increased to 178 kg/thm in November 2007, corresponding to a 65t/hr injecting rate with a productivity of 2.58 t/m3/d. This paper describes the modifications of the injection system, the problems encountered after commissioning and the strategies of process control.
机译:中钢集团(CSC)在2006年至2007年间运行着四个高炉,平均PC速率为136-143 kg / thm,采用稀相注入系统。 2004年2月,第四高炉的PC产量达到151 kg / thm,约为设计的45t / hr注入量的117%。由于现有系统注射能力的限制; CSC在2006年进行了一个项目,对注入系统进行升级。根据KUETTNER公司的技术,CSC 4号高炉的注入系统被改造为密相系统,并计划于2007年5月关闭。调整操作参数后,PC速率在2007年11月增加到178 kg / thm,相当于65t / hr的注入速率,生产率为2.58 t / m3 / d。本文介绍了喷射系统的修改,调试后遇到的问题以及过程控制策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号