Burrinjuck Dam is a concrete gravity dam located in a narrow gorge on the Murrumpidgee River in NSW. The maximum heith of the dam is 93 m above the lowest point of the foundation, and the maximum base width is 61 m. The crest lenth of the non-overflow section between the sector gates is 152 m and the total length of the dam is 233 m. Plummets and targets were used in the dam to monitor the vertical and horizontal movement of the dam at a number of locations during and after extensive upgrading w orks. The data collection was commenced before the upgrading started and almost 8 years of data were available. This paper outlines the deflections measured in the dam due to te,perature variations and comparison of the measured thermal deflections with those predicted from a finite element analysis of the dam.
机译:Burrinjuck大坝是混凝土重力坝,位于新南威尔士州Murrumpidgee河上的狭窄峡谷中。坝的最大高程比基础最低点高93 m,最大底宽为61 m。扇形闸门之间的非溢流段的顶部长度为152 m,坝体的总长度为233 m。在大修工程期间和之后,大坝中使用了垂锤和目标来监测大坝在多个位置的垂直和水平运动。在升级开始之前就已经开始收集数据,并且可以使用将近8年的数据。本文概述了由于温度,性能变化而在大坝中测得的挠度,并将测得的热挠度与通过坝体有限元分析预测的挠度进行比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号