This paper proposes a multistage power distribution planning (PDP) method. The optimization method considers various planning alternatives that include the reinforcement of the existing feeders/substations, the construction of new distribution lines, and the placement of voltage regulators. The objective function aims at minimizing the net present value (NPV) of the network investment costs ensuring the safe operation of the distribution network throughout the planning period. The solution methodology consists of two phases. First, a mixed-integer quadratically constrained programming (MIQCP) model is formulated that determines the network investments, i.e., the reinforcement of substations and distribution lines, the network expansion plan and the voltage regulator (VR) placement at the final year of the planning period. Afterwards, a back-propagation method is adopted in order to define the year of commissioning the network investments that have been computed in the first phase. The efficiency of the proposed methodology is tested on a 22-bus distribution network under three different load growth scenarios.
机译:本文提出了一种多阶段配电规划(PDP)方法。优化方法考虑了各种计划选择,包括加强现有的馈线/变电站,建造新的配电线路以及放置电压调节器。目标功能旨在最大程度地减少网络投资成本的净现值(NPV),以确保整个计划期间配电网络的安全运行。解决方案方法包括两个阶段。首先,建立混合整数二次约束规划(MIQCP)模型,该模型确定网络投资,即变电站和配电线路的加固,网络扩展计划和规划最后一年的电压调节器(VR)放置期。之后,采用反向传播方法来定义调试在第一阶段中计算出的网络投资的年份。在三种不同的负载增长方案下,在22总线配电网络上测试了所提出方法的效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号