Power system stabilizer tuning and testing at the Teesside Power Project, Teesside, England

机译:在英格兰蒂赛德的蒂赛德电力项目中进行电力系统稳定器调试和测试

获取原文

摘要

This paper illustrates the simple yet rigorous steps that can be followed to appropriately tune power system stabilizers (PSSs). The paper also shows the field tests that can be performed to verify stabilizer performance. The procedures are illustrated with the results of a PSS application at a new 1800 MW combined-cycle power plant in Northeastern England. Tuning and field testing are proven to be a rapid and efficient process. The whole process from stabilizer tuning to tuning implementation and testing at the plant site was completed in less than two weeks.
机译:本文说明了简单而严谨的步骤,可以按照这些步骤适当调整电源系统稳定器(PSS)。本文还显示了可以执行的现场测试,以验证稳定器的性能。 PSS在英格兰东北部新的1800 MW联合循环电厂中的应用结果说明了该程序。事实证明,调优和现场测试是一个快速而有效的过程。从稳定器调整到调整实施以及在工厂现场进行测试的整个过程都在不到两周的时间内完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号