首页> 外文会议>International conference on applications of statistics and probability;ICASP8 >Consideration of the serviceability limit state in a time dependent probabilistic cost model
【24h】

Consideration of the serviceability limit state in a time dependent probabilistic cost model

机译:在时间相关的概率成本模型中考虑可使用性极限状态

获取原文

摘要

This paper describes the framework for a model for decision making and planning of repair and maintenance interventions on civil engineering structures. This model integrates costs due to failure, intervention and loss of serviceability as well as their variation over time. The model uses system reliability analysis as a tool for determining structural safety and serviceability. Furthermore, a comparison of the importance of cost items is performed, showing that the influence of serviceability costs is significant and that they must be considered during the planning of structural repair and maintenance strategies.
机译:本文介绍了用于土木工程结构的维修和维护干预措施的决策和计划模型的框架。该模型整合了由于故障,干预和可维护性损失而产生的成本,以及它们随时间的变化。该模型使用系统可靠性分析作为确定结构安全性和可维修性的工具。此外,对成本项目的重要性进行了比较,表明可维修性成本的影响很大,在规划结构维修和维护策略时必须考虑这些因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号