首页> 外文会议>American Power Conference >SYSTEM INSTALLATION AND BURNING OF COKE OVEN GAS AT DETROIT EDISON'S RIVER ROUGE POWER PLANT
【24h】

SYSTEM INSTALLATION AND BURNING OF COKE OVEN GAS AT DETROIT EDISON'S RIVER ROUGE POWER PLANT

机译:底特律爱迪生河胭脂电厂的焦炉气体安装和燃烧

获取原文

摘要

The COG burning facilities described herein and their operation are proving practical and economical for both GLD and Detroit Edison. When the system for No. 3 Boiler is completed in June 1994, Detroit Edison will have the capability to burn GLD's excess COG gas in either or both the River Rouge Power Plant's operating boilers. In the event that a utility is in a geographical location near a steel making facility, large pulverized coal fired boilers can be successfully retrofitted at a reasonable cost to burn both COG and BFG gases as supplemental fuels. The COG burning facilities described herein represent another milestone in the Company's continuing effort to work with its large industrial customers to reduce overall power costs while still meeting all environmental limitations for the benefit of its customers, shareholders and general public.
机译:本文所述的COG燃烧设施及其操作对于GLD和底特律爱迪生来说都是实用和经济的。当1994年6月完成第3次锅炉的系统时,底特律爱迪生将能够在河流胭脂发电厂的运行锅炉中燃烧GLD过剩的多余齿轮汽油。如果效用在钢制造设施附近的地理位置,大型粉煤燃烧锅炉可以以合理的成本成功地改装,以燃烧齿轮和BFG气体作为补充燃料。本文所述的COG燃烧设施代表了公司持续努力与大型工业客户努力降低整体电力成本的另一个里程碑,同时仍然满足其客户,股东和公众的利益的所有环境限制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号