首页> 外文会议>American Power Conference >INTRODUCING EWGs INTO THE TRANSMISSION SYSTEM- SECURITY AND OPERATIONAL CONSIDERATIONS
【24h】

INTRODUCING EWGs INTO THE TRANSMISSION SYSTEM- SECURITY AND OPERATIONAL CONSIDERATIONS

机译:将EWG引入传输系统 - 安全性和操作考虑

获取原文

摘要

Current trends in the power industry indicate that independent power producers have emerged as a source in the wholesale power market. As a result of the National Energy Act of 1992, utilities are now expected to be more open to transmission access issues and to justify their decisions in this area. The cost of wheeling, beyond what is calculated from the embedded or marginal costs, should also include considerations for operational and system security concerns. These considerations rely on the comprehensive analytical evaluation of the system in the presence of the proposed transmission access. Recent requirements by FERC mandate that utilities provide their system data in a centralized database. The availability of such data certainly benefits transmission access studies and practices.
机译:电力行业的当前趋势表明,独立电力生产商已成为批发电力市场的来源。由于1992年的国家能源法案,实用处预计将更加开放传输访问问题,并为其在该领域的决定辩护。轮班的成本,超出了嵌入或边际成本计算,还应包括用于运营和系统安全问题的考虑因素。这些考虑因素依赖于在建议的传输访问情况下对系统的综合分析评估。 FERC授权的最新要求该实用程序在集中式数据库中提供其系统数据。此类数据的可用性肯定有利于传输访问研究和实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号