REMEDIATION AND RECYCLING OF OIL-CONTAMINATED SOIL BENEATH A LARGE ABOVE-GROUND STORAGE TANK

机译:在大型地上储罐下方的含油土壤的修复和再循环

获取原文

摘要

While retrofitting a large 30-year-old, above-ground petroleum storage tank, Southern California Edison Company (SCE) discovered that soil beneath the fixed-roof, single-bottom tank was contaminated with 40,000 gallons of #6 fuel oil. The steel tank was left in place during the excavation and remediation of the contaminated soil to retain the operating permit. The resulting 2000 tons of contaminated aggregate was recycled to make asphalt concrete for paving the tank basin and the remaining 5600 tons of oily soil was thermally treated on site for use as engineered fill at another location. This successful operation provided an economical cleanup solution for a common leakage problem of single-lined tanks and eliminated the long-term liability of Class I landfill disposal. As a pro-active environmental effort, this paper shares SCE's site assessment procedure, reveals the engineering method developed to stabilize the tank, discusses the soil treatment technologies used, describes the problems encountered and lessons learned during the cleanup, discloses the costs of the operation, and offers guidelines and recommendations for similar tank remediation. This paper does not describe the work or costs for removing or replacing the tank bottom.
机译:虽然加装了大量30岁,地上石油储罐,南加州爱迪生公司(SCE)发现固定的屋顶下,土壤,单底罐中混有#6燃料油40000加仑。钢罐被污染的土壤,以保持经营许可证的挖掘和修复过程中留在原地。得到的2000吨污染总量的再循环,使沥青混凝土摊铺槽盆,其余5600吨油污对现场进行热处理在其他地点作为设计的填充。此手术成功提供了一种用于单衬里罐的一个共同的泄漏问题的经济的净化溶液并消除I类填埋处理的长期责任。作为一个积极的环保努力,本文股SCE的现场评审过程中,揭示了发展稳定罐的工程方法,讨论了用于土壤处理技术,介绍了清理过程中了解到遇到的问题和教训,公开了操作成本,并提供指导方针和建议类似坦克整治。本文不介绍拆卸或更换水箱底部的工作或成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号