While retrofitting a large 30-year-old, above-ground petroleum storage tank, Southern California Edison Company (SCE) discovered that soil beneath the fixed-roof, single-bottom tank was contaminated with 40,000 gallons of #6 fuel oil. The steel tank was left in place during the excavation and remediation of the contaminated soil to retain the operating permit. The resulting 2000 tons of contaminated aggregate was recycled to make asphalt concrete for paving the tank basin and the remaining 5600 tons of oily soil was thermally treated on site for use as engineered fill at another location. This successful operation provided an economical cleanup solution for a common leakage problem of single-lined tanks and eliminated the long-term liability of Class I landfill disposal. As a pro-active environmental effort, this paper shares SCE's site assessment procedure, reveals the engineering method developed to stabilize the tank, discusses the soil treatment technologies used, describes the problems encountered and lessons learned during the cleanup, discloses the costs of the operation, and offers guidelines and recommendations for similar tank remediation. This paper does not describe the work or costs for removing or replacing the tank bottom.
展开▼