首页> 外文会议>ITE annual meeting >PRACTICAL APPLICATION OF THE COMBINED FTA/FHWA PLANNING PROCESS; ISSUES TO GUARANTEE SUCCESS
【24h】

PRACTICAL APPLICATION OF THE COMBINED FTA/FHWA PLANNING PROCESS; ISSUES TO GUARANTEE SUCCESS

机译:FTA / FHWA组合计划过程的实际应用;保证成功的问题

获取原文

摘要

With passage of the Intermodal Surface Transportation Efficiency Act (ISTEA), a major change in the planning of corridor transportation improvements was enacted. This legislation includes the linkage of transportation improvements to regional air quality and the analysis of intermodal alternatives. New procedures have been adopted and guidelines issued to ensure that a thorough analysis of alternatives is considered in the planning phase. Before ISTEA, the Federal Transit Administration (FTA) required the completion of an alternatives analysis before approving grants for major transit projects. The consideration of alternatives in the Federal Highway Administration (FHWA) process consisted primarily of route variations for a highway project. Since the passage of ISTEA, the differences between these processes have had to be reconciled to ensure truly intermodal planning. This paper describes the experiences of the San Diego and Dallas areas with the emerging planning requirements. It concludes with observations to help make the overall corridor planning process a success.
机译:随着《多式联运地面运输效率法》(ISTEA)的通过,对走廊运输改善计划进行了重大修改。这项立法包括将交通运输的改善与区域空气质量联系起来,并对多式联运的替代方案进行分析。通过了新程序并发布了指南,以确保在规划阶段考虑对替代方案进行全面分析。在ISTEA之前,联邦运输管理局(FTA)在批准大型运输项目的赠款之前,要求完成替代方案分析。联邦公路管理局(FHWA)流程中对替代方案的考虑主要包括高速公路项目的路线变更。自ISTEA通过以来,必须调和这些程序之间的差异,以确保真正的多式联运计划。本文介绍了圣地亚哥和达拉斯地区的经验以及新出现的规划要求。最后总结了一些意见,以帮助使整个走廊规划过程取得成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号