The CANDU 9 design is based upon the 900 MWe class Darlington station i nCanada, which is among the world leading nuclear power stations for capacity factor with low operation, maintenance and administration costs. The CANDU 9 design provides an advanced control centre with enhanced operations features. The advanced AECL control centre design includes the proven functionality of existing CANDU control centres, those implementable characteristics identified by systematic design combined with a human factors analysis of operations requirements and features needed to improve station operability which are made possible by the application of current technology. The design strategy is to preserve the general main control room operations staff work area as unchanged as possible to facilitate the inclusion of past features and operational experience while incorporating operability improvements.