首页> 外文会议>Annual conference on explosives and blasting technique >Some Problems on Quarrying Rock Material of Rock Fill Dam with Concrete Facing by Blasting
【24h】

Some Problems on Quarrying Rock Material of Rock Fill Dam with Concrete Facing by Blasting

机译:爆破混凝土面板堆石坝岩体开采的若干问题。

获取原文

摘要

The blasting quarrying technology of rock material of rock-fill dam is one of the more complex problems in the field of engineering blasting at present. The Kuz-Ram model is not suited to predict fragmentation distribution under the geology condition of Tianshengqiao(TSQ) fist-step power station. The modification of kuz-Ram model is discussed. With reference to the idea of model establishment of Kuz-Ram model and according to the results of experimental blasting in-situ, two fragmentation prediction models - TSQ-1 and TSQ-2 model are presented which are adapted to the particular condition of rock material querying blasting of rock-fill dam with concrete facing of TSQ first-step power station. The rapid judgment method of qualified grade material and the method of optimizing blasting parameters are also presented in this paper.
机译:堆石坝岩石材料的爆破采石技术是目前工程爆破领域中较为复杂的问题之一。在天生桥一阶电站地质条件下,Kuz-Ram模型不适合预测碎裂分布。讨论了kuz-Ram模型的修改。结合库兹-拉姆模型建立模型的思想,根据现场爆破试验结果,提出了两种破碎预测模型——TSQ-1和TSQ-2模型,它们分别适用于岩石材料的特殊条件。 TSQ一级电站混凝土面板堆石坝爆破查询。本文还提出了优质品位材料的快速判别方法和爆破参数的优化方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号