Method for Shortening the construction Process of a Large-Scale Lng Receiving Terminal Methode De Reduction Du Delai De Construction D'UN Terminal De Reception Gnl D'Une Grande Echelle

机译:缩短大型Lng接收站的施工方法的方法还原法杜德莱德建造D'UN终端机接收Gnl D'Une Grande Echelle

获取原文

摘要

Chubu Electric Power Co., Inc. has recently constructed, along with an extension of No.3 and No.4 units of high-efficiency combined cycle power generation system (total output 3,300MW) at its Kawagoe Thermal Power Station, a new terminal for receiving approximately 3 million tons of LNG annually from first project in Qatar, the Near & Middle East.
机译:中部电力株式会社最近在川越热力发电站新建了第3号机组和第4号机组的高效联合循环发电系统(总输出3,300MW),并对其进行了扩建每年从卡塔尔,近东和中东的第一个项目接收约300万吨的液化天然气。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号