首页> 外文会议>Ammonia Plant Safety Related Facilities >Primary Reformer Modifications in Fertilizer Plant
【24h】

Primary Reformer Modifications in Fertilizer Plant

机译:化肥厂的主要重整器改造

获取原文

摘要

A redesign and retubing of the primary reformer was included in the revamp of the Kujang Fertilizer ammonia Plant. The new tubes had several problems, including a rupture in the second year of operation and embrittlement cracking of unstress relieved welds in the sixth year of operation, both of which led to plant shutdowns. These failures, and measures to prevent future failures, are explored.
机译:Kujang化肥氨厂的改造包括一次重整炉的重新设计和换管。新管有几个问题,包括在运行的第二年破裂和在运行的第六年无应力释放焊缝的脆性开裂,这两种情况均导致工厂停工。探索了这些故障以及防止将来发生故障的措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号