Effective front-end planning (FEP) has repeatedly been shown in past research to positively affect project outcomes. The results of poor FEP for a single project can potentially have a devastating and long-lasting effect on an individual organization. Since the economic world is becoming quite "flat" and extremely competitive, one question that can be asked is: why are there organizations with ineffective front-end planning strategies or none at all in this global economy? Members of the Construction Industry Institute (CII) were surveyed to identify barriers to effective front-end project planning, with 59 organizations responding. Common barriers such as lack of adequate resources will be discussed in this paper. Over 70 percent of respondents use at least one CII-developed FEP tool in their planning process and the use of tools has had a positive effect in overcoming barriers to effective planning. This paper will describe survey results and give recommendations to practitioners for improving FEP efficacy in order to improve capital project portfolio.
机译:过去的研究中,有效的前端规划(FEP)已在过去的研究中展示,以积极影响项目结果。单一项目的糟糕FEP的结果可能对个体组织产生毁灭性和持久的影响。由于经济世界变得相当“平坦”而且极具竞争力,可以被问到的一个问题是:为什么在全球经济中的前端规划策略或没有无效的组织?调查了建筑业学院(CII)的成员,以确定有效的前端项目规划的障碍,有59个组织应对。本文将讨论诸如缺乏足够资源的常见障碍。超过70%的受访者使用至少一个CII开发的FEP工具在他们的规划过程中,使用工具在克服有效规划的障碍方面具有积极影响。本文将描述调查结果,并向从业者提出建议,以提高FEP效力,以改善资本项目组合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号