Advice on the implementation of risk management for the construction of tunnels and underground works

机译:关于实施隧道和地下工程建设风险管理的建议

获取原文

摘要

Compared with ordinary civil engineering works, the risk management of tunnels and underground works has the same meaning.a. risk identificationIt means the discovery of potential risks in the whole construction period.b. risk analysisEach risk may be predicted by the time, frequency and degree of harm.c. risk assessmentThe value of basic attitude or attention for each risk should be attained through mathematical calculation in this phase.d. risk controlIt is the destination of risk management. There are three ways to control risk.risk aversionFor example, we can bypass the serious adverse geological sites in the planning of tunnel location and direction.
机译:与普通的土木工程相比,隧道和地下工程的风险管理具有相同的含义。 一种。风险识别 这意味着在整个施工期间发现潜在的风险。 b。风险分析 每种风险可以通过伤害的时间,频率和程度来预测。 C。风险评估 在此阶段,应通过数学计算获得对每种风险的基本态度或关注值。 d。风险控制 这是风险管理的目的地。有三种控制风险的方法。 风险规避 例如,我们可以在规划隧道位置和方向时绕过严重的不利地质部位。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号