首页> 外文会议>GEO-DENVER 2007 >A COMPARISON OF THREE PROJECTS UTILIZING AUGER CAST PILES
【24h】

A COMPARISON OF THREE PROJECTS UTILIZING AUGER CAST PILES

机译:三种使用俄斯特铸造桩的项目的比较

获取原文

摘要

Auger cast piles were employed to support major equipment additions under three separate projects during 2005 and 2006 at one electric generation plant in south Alabama. Due to the subsurface profile variations within the plant and differing foundation loading, various lengths of auger cast piles were installed. Axial load tests, lateral load tests and pile integrity testing were used on some of the projects. Several problems during construction required modifications to installation methods, including a change in foundation type mid-project on one of the additions. Predicted and measured capacities for both axial compression and lateral capacity are compared, along with a discussion on the various problems encountered during construction. The paper also stresses how historical information regarding existing facilities plays an important role in the selection and performance of foundation types.
机译:在2005年至2006年期间,在阿拉巴马州南部的一家发电厂中,通过三个独立的项目,使用螺旋钻桩来支撑主要设备的增加。由于工厂内地下轮廓的变化和基础荷载的不同,因此安装了各种长度的螺旋钻桩。在某些项目中使用了轴向载荷测试,侧向载荷测试和桩身完整性测试。施工过程中的几个问题需要对安装方法进行修改,包括在其中一项中对基础类型的中间项目进行更改。比较了轴向压缩力和侧向承载力的预测和测量能力,并讨论了在施工过程中遇到的各种问题。本文还强调了有关现有设施的历史信息如何在基础类型的选择和性能中发挥重要作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号