首页> 外文会议>GEO-DENVER 2007 >Monitoring the Installation and Curing of a Large Diameter ACIP Pile in Very Dense Sand
【24h】

Monitoring the Installation and Curing of a Large Diameter ACIP Pile in Very Dense Sand

机译:监测大直径ACIP桩在非常浓密的沙子中的安装和固化

获取原文

摘要

In this study, installation and curing of a 760 mm (30-inch) diameter and 10 m (32 ft) long ACIP pile with a design capacity of 800 kN (92 tons) in very dense sand was investigated. The dense sand layer was about 11 m (35 ft.) thick and was located 7 m (23 ft.) below ground. During the installation, torque on the gear box advancing the auger was recorded and it varied from 2.5 to 50 kN.m (2000 ft-lbs to 36,000 ftlbs). The auger advancement rate varied from 12 to 83 mm/sec. The grout was characterized using the flow cylinder method and the flow diameter was 20 cm (8 inch). The grout volume ratio and pumping pressures were monitored at every 1 m (3 ft) lift during grouting. The curing of the pile was monitored using axial vibrating wire strain gages at four levels (10 gages) and lateral vibrating wire strain gages at two levels (two gages). The residual strains and temperature profiles in the curing pile was monitored over period of a week to determine the appropriate time for load testing the pile. The peak temperature from the edge of the pile to the center of the pile varied by over 8°C and the peak temperature in the pile was 63°C in the center of the pile. The maximum temperature measured was over 40 °C higher than the surrounding ground temperature. The average time to reach the peak temperature in the pile was 0.35 days. The average maturity for the grout used in the pile was 1180°C-hrs. The average residual axial and lateral strains in the pile after 7 days of curing were compressive and increased with depth.
机译:在这项研究中,研究了直径为760 mm(30英寸),长10 m(32 ft)的ACIP桩的安装和养护,其设计能力为800 kN(92吨),在非常稠密的沙子中。致密的沙层厚约11 m(35 ft。),位于地下7 m(23 ft。)处。在安装过程中,记录了推进螺旋钻的齿轮箱上的扭矩,扭矩从2.5到50 kN.m(2000英尺磅至36,000英尺磅)不等。螺旋推进速度从12毫米/秒到83毫米/秒不等。使用流动圆筒法对浆液进行表征,流动直径为20厘米(8英寸)。在灌浆过程中,每1 m(3 ft)升程监测一次灌浆体积比和泵送压力。使用四个级别的轴向振弦应变计(10个)和两个级别的横向振弦应变计(两个)来监视桩的固化。在一周的时间内监测固化桩中的残余应变和温度曲线,以确定对桩进行载荷测试的合适时间。从堆的边缘到堆的中心的峰值温度变化超过8℃,并且堆中的峰值温度在堆的中心为63℃。测得的最高温度比周围的地面温度高40°C以上。达到堆中最高温度的平均时间为0.35天。桩中使用的灌浆的平均成熟度为1180°C-小时。养护7天后,桩中的平均轴向和横向残余应变是受压的,并随深度的增加而增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号