首页> 外文会议>2007 IYRF;International Yellow River Forum on Sustainable Water Resources Management and Delta Ecosystem Maintenance >Discussion on Substituting Constructional System Reform on the Projects Invested by the Government
【24h】

Discussion on Substituting Constructional System Reform on the Projects Invested by the Government

机译:论政府投资项目代建制改革

获取原文

摘要

It is suggested that the implementation of substituting constructional system in the flood control engineering construction and administration of the Lower Yellow River through analysis on the features and advantages of substituting constructional system starting from the characteristics of the flood control engineering of the Lower Yellow River and the present system of construction and administration.
机译:从黄河下游防洪工程的特点和特点出发,分析代建制的特点和优势,建议在黄河下游防洪工程建设和管理中实施代建制。现有的建设和管理体系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号