首页> 外文会议> >Application of the multi-level fuzzy decision-making method in the social evaluation of hydraulic engineering construction project
【24h】

Application of the multi-level fuzzy decision-making method in the social evaluation of hydraulic engineering construction project

机译:多层次模糊决策方法在水利建设项目社会评价中的应用

获取原文

摘要

The social evaluation of construction projects is a complex system consisted of multiple subsystems. Evaluation indicators are made up of quantitative and qualitative indicators. In allusion to the characteristics in the social evaluation on hydraulic engineering construction projects, using the multi-level fuzzy decision-making model, the binary comparison method is specially established to determine indicators weight. Finally, this method is used to the social evaluation on Shule River comprehensive development projects, the practicability and reliability of which are reflected well.
机译:建设项目的社会评价是一个由多个子系统组成的复杂系统。评价指标由定量和定性指标组成。针对水利建设项目社会评价的特点,运用多级模糊决策模型,专门建立了二元比较法来确定指标权重。最后,将该方法用于疏勒河综合开发项目的社会评价,充分反映了该方法的实用性和可靠性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号