首页> 外文会议>Third International Symposium on Information Processing >Study on Risk Assessment of Power Network Planning Projects Based on G1 Method and F-DS Evidential Theory
【24h】

Study on Risk Assessment of Power Network Planning Projects Based on G1 Method and F-DS Evidential Theory

机译:基于G1方法和F-DS证据理论的电网规划项目风险评估研究。

获取原文

摘要

Considering the problem that it is difficult to quantify the uncertainty problem about risk assessment of power network planning projects, G1 method and F-DS evidential theory are adopted to establish the assessment model of power network planning projects. Put forward the weighted formula of evidence combination with the use of G1 method. Apply information fusion technology of F-DS evidential theory to translate complicated and uncertain risk assessment to deterministic decision-making, which could realize the final measurement. The empirical test shows that this approach could improve the feasibility and validity of risk assessment and provide decision support for planning department.
机译:针对电网规划项目风险评估中难以量化的不确定性问题,采用G1法和F-DS证据理论建立了电网规划项目评估模型。运用G1方法提出了证据组合的加权公式。应用F-DS证据理论的信息融合技术,将复杂,不确定的风险评估转化为确定性决策,可以实现最终度量。实证检验表明,该方法可以提高风险评估的可行性和有效性,并为规划部门提供决策支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号