首页> 外文会议>International conference on coasts, marine structures and breakwaters >The construction of Weston-super-Mare sea defences and seafront enhancements
【24h】

The construction of Weston-super-Mare sea defences and seafront enhancements

机译:滨海韦斯顿海上防御工事和滨海增强工程的建设

获取原文

摘要

With the third construction phase well advanced and due to be completed in 2010, the team continues to focus on best value, high quality and timely, safe delivery. There are many significant challenges to come; not least the threat of future storms and damage to the part completed works, the separate Pier Square and Grand Pier projects that will have to be accommodated in the contractor's programme and the yearly events such as the British Water-ski Championships and T4 on the Beach.
机译:随着第三阶段建设的顺利进行,并计划于2010年完成,团队将继续专注于最物有所值,高质量和及时安全的交付。面临许多重大挑战。尤其是未来暴风雨的威胁和对部分已完成工程的破坏,单独的码头广场和大码头项目,这些项目将必须纳入承包商的计划中,以及年度活动,例如英国滑水锦标赛和海滩上的T4 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号