The majority of small scale steam turbine generator projects are installed as an afterthought to overall plant design. As a plant manager or process engineer, the primary concern is providing the process with the thermal load it needs at the lowest $ per Btu. The viability of installing a steam turbine generator set comes after the plant is in operation and pressure reducing valves (PRV's) have been installed, providing the opportunity has been proven to be sufficient for onsite power generation. This methodology produces reliable systems that operate with whatever steam conditions were present. What if users could take a step back to the initial design of the steam boiler? Plant engineers can proactively analyze the impact of folding a steam turbine generator set into the overall plant design at the pre-construction phase, significantly decreasing total energy costs and reducing the net $ per Btu. This paper analyzes the costs and benefits of integrating a steam turbine generator set into the initial boiler plant design, with marginal fuel increase and equipment cost yet providing the added benefit of clean, low cost and reliable onsite power production.
机译:大多数小型蒸汽轮发电机项目的安装是对整个电厂设计的事后思考。作为工厂经理或过程工程师,首要考虑的是为过程提供所需的热负荷,每英热单位的成本最低。在工厂开始运转并安装了减压阀(PRV)之后,才可以安装蒸汽轮机发电机组,前提是已证明该机会足以进行现场发电。这种方法产生了可在任何蒸汽条件下运行的可靠系统。如果用户可以退回到蒸汽锅炉的初始设计该怎么办?工厂工程师可以在施工前阶段积极分析将蒸汽轮机发电机组折叠到整个工厂设计中的影响,从而显着降低总能源成本并降低每Btu的净成本。本文分析了将蒸汽轮发电机组集成到初始锅炉设备设计中的成本和收益,虽然增加了边际燃料和设备成本,但又带来了清洁,低成本和可靠的现场发电的附加收益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号