首页> 外文会议>International conference on frontiers of manufacturing and design science >Research on Walling-up with Concrete Block Technology of Gob-side Entry Retaining Based on Fully Mechanized Face in Medium-thickness Coal Seam
【24h】

Research on Walling-up with Concrete Block Technology of Gob-side Entry Retaining Based on Fully Mechanized Face in Medium-thickness Coal Seam

机译:中等厚煤层综采面沿空留巷混凝土砌块护壁技术研究。

获取原文

摘要

Gob-side entry retaining is an advanced and green mining technology,which can avoid using pillar and island working face,reduce driving workload,alleviate the tension between extraction and driving,and achieve a Y-type ventilation.The coal mine in this research successfully reserved a 485m roadway in No.10302 fully mechanized coal face by employing wide lane driving,pre-driven roadway,pre-controlling immediate roof in the roadway,and gob-side entry retaining by walling up with multi-standard concrete block using break-joint vertical stacking technology.From doing so,the supporting effect is significant,the roadway is integrated and the stable wall is free of distortion or cracking.This research paves a new way for gob-side entry retaining of fully mechanized mining in China.
机译:沿空留巷是一种先进的绿色开采技术,可避免使用支柱和孤岛工作面,减少了掘进工作量,减轻了掘进和掘进之间的张力,实现了Y型通风。通过采用宽车道驾驶,预驱动式巷道,预控制巷道中的直接顶板以及在采空区侧入口保留采用折断法的多标准混凝土砌块来保留10302号综采工作面中的485m巷道联合立式堆垛技术。这样做具有显着的支护效果,巷道得以整合,稳定的墙体没有变形或开裂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号