首页> 外文会议>Chinese Control and Decision Conference >Scheduling Method for Tire Building Based on Heuristic Algorithm
【24h】

Scheduling Method for Tire Building Based on Heuristic Algorithm

机译:基于启发式算法的轮胎建设调度方法

获取原文

摘要

There are more product specifications, great production and much equipment over the whole process of tire building. The actual complex scheduling problem of tire building is described in detail. To solve the complex multi-objective, large-scale production scheduling problem of tire building, a heuristic algorithm is proposed from the experience of the experts. The algorithm was tested by online data. Results show that the heuristic algorithm can quickly workout the optimal production scheduling of tire building, reduce the production cost, and improve productivity. The algorithm will lay the firm groundwork for application to production process in the future.
机译:在轮胎建筑的整个过程中还有更多的产品规格,巨大的生产和设备。详细描述了轮胎建筑的实际复杂调度问题。为了解决轮胎建设的复杂多目标,大规模生产调度问题,从专家的经验提出了一种启发式算法。通过在线数据测试算法。结果表明,启发式算法可以快速锻炼轮胎建设的最佳生产调度,降低生产成本,提高生产率。该算法将在未来奠定坚定的基础,以便将来应用于生产过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号