首页> 外文会议>Chinese Control and Decision Conference >Aggregated hydro unit based model for short-term hydro generation scheduling
【24h】

Aggregated hydro unit based model for short-term hydro generation scheduling

机译:基于聚集水力单元的短期水力发电调度模型

获取原文

摘要

An effective way to reduce the computational complexity of short-term hydro generation scheduling is to adopt the so called aggregated hydro unit based model (AHU). However, some fundamental problems related with AHU have not been fully discussed in literature yet. The theoretical properties, methods for constructing approximated AHU and the related error analysis issues are discussed in this paper. A method is established also in this paper to give an approximated AHU which can maintain a good balance between approximation error and model complexity. Numerical testing results show that the method proposed in this paper is effective. The model established in this paper can be used in both hydro producer self-scheduling and hydro-thermal generation scheduling.
机译:减少短期水力发电调度计算复杂性的有效方法是采用所谓的基于聚集水电单元的模型(AHU)。但是,有关AHU的一些基本问题尚未在文献中得到充分讨论。本文讨论了近似AHU的理论性质,构造方法以及相关的误差分析问题。本文还建立了一种给出近似AHU的方法,该方法可以在近似误差和模型复杂度之间保持良好的平衡。数值测试结果表明,该方法是有效的。本文建立的模型既可用于水力发电企业的自调度,又可用于水热发电调度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号