首页> 外文会议>International topical meeting on nuclear plant instrumentation, control, and human-machine interface technologies >A CHECKLIST FOR INTEGRATING AND PLANNING HUMAN FACTORS ENGINEERING ACTIVITIES IN CONTROL ROOM MODERNIZATION PROJECTS
【24h】

A CHECKLIST FOR INTEGRATING AND PLANNING HUMAN FACTORS ENGINEERING ACTIVITIES IN CONTROL ROOM MODERNIZATION PROJECTS

机译:控制室现代化项目中人为因素工程活动的集成和规划清单

获取原文

摘要

As the average age of the operating Nuclear Power Plants (NPPs) increases, the need for modernization projects in this industry is growing throughout the world. There is thus a need to gather information on previous experiences and to learn from them, to be able to find solutions to main challenges and also to establish repeatable good practices. We have conducted a survey and a workshop on the topic of modernization experiences in control rooms. The results, comments, and suggestions emphasized the relevance of planning for the modernization projects, both related to the general project - for example, defining which competences will be involved - and also to each specific activity - for instance, which Human Factors Engineering (HFE) tasks will be performed and when. Based on this information, and taking into consideration the NUREG-0711 recommendations, we propose a planning checklist that might be used as a general guidance tool during the initial stages of a modernization project. The checklist is composed by six main areas, with specific recommendations for each: Project Planning & HFE Program Management; HFE Analysis; HSI Design & Design Implementation; Training Program & Procedure Development; Human Factors Verification and Validation; and Human Performance Monitoring. In this paper we describe the background, development and evaluation of the first version of the checklist, and also how we anticipate how it could be used.
机译:随着运行中的核电站(NPP)的平均寿命的延长,该行业对现代化项目的需求在全世界范围内都在增长。因此,需要收集有关先前经验的信息并向他们学习,以便能够找到解决主要挑战的方法并建立可重复的良好做法。我们进行了有关控制室现代化经验的调查和研讨会。结果,评论和建议强调了现代化项目规划的相关性,既与一般项目相关,例如,定义将涉及的能力,也与每个特定活动有关,例如,哪些人为因素工程(HFE) )任务将在何时执行。根据这些信息,并考虑到NUREG-0711的建议,我们提出了一个规划清单,可以在现代化项目的初始阶段用作一般指导工具。该清单由六个主要领域组成,每个领域都有具体建议:项目计划和HFE计划管理; HFE分析;恒指设计及设计实施;培训计划和程序开发;人为因素验证和确认;和人类绩效监控。在本文中,我们描述了清单第一版的背景,开发和评估,以及我们如何预期如何使用该清单。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号