Sarah Mildred Long Bridge Replacement – Two States, Three Bridges in One

机译:萨拉·米尔德雷德(Sarah Mildred)的长桥更换-两种状态,三座桥梁合而为一

获取原文

摘要

Construction is underway to replace the Sarah Mildred Long Bridge that crosses the Piscataqua Riverbetween Kittery, Maine and Portsmouth, New Hampshire. This project has used the Construction Manager /General Contractor (CM/GC) contract delivery method. The new crossing includes vehicular approach bridgesover railroad approach bridges consisting of precast segmental concrete box girders constructed by the balancedcantilever method. The approach bridges lead to a movable lift span bridge over the navigation channel. Bridgesubstructure units consist of cast-in-place reinforced concrete approach bridge piers founded on a combination ofspread footings and drilled shafts along with precast concrete lift span towers constructed on drilled shaftfoundations.
机译:正在建设中,以取代穿越Piscataqua河的Sarah Mildred长桥 在缅因州的基特里(Kittery)和新罕布什尔州的朴茨茅斯之间。该项目使用了施工经理/ 总承包商(CM / GC)合同交付方式。新的过境点包括车辆进近桥 铁路引桥,由预制的分段混凝土箱形梁组成,由平衡杆构成 悬臂法。进近桥通向导航通道上方的可移动升程跨度桥。桥 下部结构单元由现浇钢筋混凝土引桥桥墩组成,该桥墩基于 扩建基础和钻孔竖井,以及在钻孔竖井上建造的预制混凝土举升跨度塔 基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号