首页> 外文会议>International Conference on Lightning Protection >Developed simplification of the risk assessment
【24h】

Developed simplification of the risk assessment

机译:制定了风险评估的简化

获取原文

摘要

The IEC 62305, which was published 10 years ago, has fundamentally changed the structure of planning lightning protection [1]. The method determined in the standard - which requires a detailed risk assessment for each and every structure - has made the standard user's task more difficult due to the vast amount of parameters. Meantime many criticism, application examples and explanations of the risk assessment were published [2], [3], [4], [5]. We have elaborated a developed simplified risk assessment process based on the standard, which substantially facilitates the determination of the needed level of protection in most cases.
机译:10年前发表的IEC 62305从根本上改变了规划雷电保护的结构[1]。标准中确定的方法 - 需要对每个结构进行详细的风险评估 - 由于大量参数,使标准用户的任务更加困难。与此同时,许多批评,风险评估的应用实例和解释已发表[2],[3],[4],[5]。我们阐述了基于该标准的制定的简化风险评估过程,这基本上有助于在大多数情况下确定所需的保护水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号