Change is the norm on construction projects. Change is beneficial in that owners can modify the project after contract award while contractors can increase the scope of work and project profitability without needing to compete for additional work. At the same time change can be detrimental for both owners and contractors. Change often causes projects to complete later than planned and over budget. And, owner change order processes are often lengthy detrimentally impacting contractor cash flows. As a result slow processing of change order requests by public project owners coupled with slow payment for changed work are major problems threatening project success and contractor viability. Efforts have been initiated by various governmental entities to "streamline" change order processes. The purpose of this paper is to explore current streamlining efforts. The paper also discusses difficulties in speeding up such processes and why such efforts are quite often doomed to fail - due mainly to a misunderstanding when does a change start and when does the change order process commence?
机译:变化是建筑项目的规范。更改的好处在于,业主可以在授予合同后修改项目,而承包商可以扩大工作范围和项目获利能力,而无需竞争其他工作。同时,更改可能对所有者和承包商都有害。变更通常会导致项目的完成时间比计划的晚,且超出预算。而且,所有者变更单流程通常对承包商的现金流造成长期的不利影响。结果,公共项目所有者对变更单请求的处理缓慢,再加上对变更工作的付款缓慢,是威胁项目成功和承包商生存能力的主要问题。各种政府实体已经开始努力以“简化”变更单流程。本文的目的是探索当前的精简工作。本文还讨论了加快此类流程的困难,以及为什么此类工作通常注定要失败-主要是由于对何时开始变更和何时开始变更订单的误解?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号