首页> 外文会议>Geotechnical frontiers >Sustainable Slope Protection and Cut-Off Wall Installation in Densely Populated Areas by the Press-In Piling Method
【24h】

Sustainable Slope Protection and Cut-Off Wall Installation in Densely Populated Areas by the Press-In Piling Method

机译:通过压入式打桩法在人口稠密地区进行可持续的边坡防护和防渗墙安装

获取原文

摘要

The press-in pile driving method utilizes hydraulic force to push piles into the ground by holding onto previously driven piles. The hydraulic force is provided by a sound-attenuated power pack. It generates very low noise and almost no vibration. It is also suited for physically constrained projects and for projects with limited access. Some urban projects require pile driving in low head room or with very small clearance from existing structures. In other cases, pile driving may have to be conducted without an access road to the piling location. This paper will discuss the solutions for those otherwise very difficult levee embankment upgrade and earth retaining projects with pressed-in sheet pile and pipe pile walls.
机译:压入桩打入方法利用水力通过保持先前打入的桩将桩推入地面。液压是由消音的动力装置提供的。它产生的噪音很小,几乎没有振动。它还适用于物理受限的项目和访问受限的项目。一些城市项目要求在低净空空间中打桩或与现有结构的间隙很小。在其他情况下,可能必须在没有通往打桩位置的通道的情况下进行打桩。本文将讨论采用压入式板桩和管桩墙的那些原本非常困难的堤防堤防升级和挡土工程的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号