首页> 外文会议>International Conference on Service Systems and Service Management >Fuzzy-based composite indicator development methodology for evaluating overall water BOT project performance
【24h】

Fuzzy-based composite indicator development methodology for evaluating overall water BOT project performance

机译:基于模糊的综合指标开发方法,用于评估水务BOT项目总体绩效

获取原文

摘要

The management of long-term infrastructure BOT requires complex administrative and regulatory inputs and sound institutional underpinnings to ensure partners' commitment to the contract over long time frames. Additionally, water BOT develop and use composite indicators to evaluate their overall project performance. This paper propose a novel methodology that uses fuzzy theories and an evaluation indicator system was established based on the development model of water BOT. The proposed methodology includes the utility function for normalizing, the fuzzy measure for weighting, and the fuzzy integral for aggregating. The proposed methodology includes the utility function for normalizing, the fuzzy measure for weighting, and the fuzzy integral for aggregating. A retrospective case study shows that the proposed methodology can help alleviate the indiscrimination. The methodology can contribute more accurate evaluation of overall project performance with higher degrees of performance discrimination.
机译:长期基础设施BOT的管理需要复杂的行政和法规投入以及健全的制度基础,以确保合作伙伴在长期内对合同的承诺。此外,水BOT开发并使用综合指标来评估其总体项目绩效。提出了一种利用模糊理论的新方法,并基于水BOT的发展模型建立了评价指标体系。所提出的方法包括用于归一化的效用函数,用于加权的模糊测度以及用于聚合的模糊积分。所提出的方法包括用于归一化的效用函数,用于加权的模糊测度以及用于聚合的模糊积分。回顾性案例研究表明,所提出的方法可以帮助减轻歧视。该方法可以对项目总体绩效进行更准确的评估,同时对绩效进行更高程度的区分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号