首页> 外文会议>International Conference on Emerging Technologies >Selection of waste heat recovery power plant on the basis of life cycle cost for cement industry in Pakistan: A demonstration and analytical study
【24h】

Selection of waste heat recovery power plant on the basis of life cycle cost for cement industry in Pakistan: A demonstration and analytical study

机译:基于巴基斯坦水泥行业生命周期成本的废热回收发电厂的选择:演示和分析研究

获取原文

摘要

Pakistan is a developing country with exponential power requirement and is currently facing financial and economic crises. This situation calls for increasing number of power projects those results in environmental pollution. The new trend in the world is for generating green energy. Waste heat recovery power plants are green energy producers as they replace fossil fuel based energy and in this paper a new idea is given that is selection of a Waste heat recovery power generation system, based on any methodology, on the basis of life cycle cost rather than maximum power generation. The life cycle cost of Waste heat recovery power generation system based on different methodologies are analyzed with their relevant cost of installations, costs of operation, maintenance costs, amount generated by Profit, project pay back as per internal rate of return and on the basis of analysis, best system is considered as per requirements of our system.
机译:巴基斯坦是一个具有指数力量要求的发展中国家,目前正在面临金融和经济危机。 这种情况要求越来越多的电力项目,这些能量项目导致环境污染。 世界上新趋势是为了产生绿色能源。 废热回收发电厂是绿色能源生产商,因为它们取代了化石燃料的能量,并在本文中,给出了一种基于任何方法的废热回收发电系统选择,基于生命周期的成本相当 比最大的发电。 基于不同方法的废热回收发电系统生命周期成本及其相关的安装成本,运营成本,维护成本,受利润产生的金额,项目按内部回报率和基于 分析,根据我们系统的要求考虑最佳系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号