首页> 外文会议>International Conference on Emerging Technologies >A feasibility study for deployment of wind energy based power production solution in Islamabad, Pakistan
【24h】

A feasibility study for deployment of wind energy based power production solution in Islamabad, Pakistan

机译:巴基斯坦伊斯兰堡风能生产解决方案部署的可行性研究

获取原文

摘要

This paper presents a theoretical study about the potential of power generation based on wind energy in Islamabad, Pakistan. A complete design for a wind turbine is presented with specifications about the characteristics of wind turbine to be deployed e.g. blade length, cut-in speed, rated speed, shutdown speed, hub height etc. Weather data for Islamabad Airport (year 2002–2011) is analyzed and calculations are made based on this data to determine the available wind energy and the portion of this energy that may be converted to useful power. Finally, selection of a wind turbine system, best suited to the climatic conditions of Islamabad, is made by comparing the specifications of some of the available systems in market. The goal of this paper is to highlight the potential of Islamabad in particular, and Pakistan in general, to produce electric power based on its wind energy potential.
机译:本文介绍了基于巴基斯坦伊斯兰堡风能发电潜力的理论研究。 有关待部署风力涡轮机的特性的规格,提供了一种风力涡轮机的完整设计。 刀片长度,切入速度,额定速度,关闭速度,轮毂高度等。分析了伊斯兰堡机场的天气数据(2002-2011年),基于该数据进行计算,以确定可用的风能和该部分 可以转换为有用的能量的能量。 最后,通过比较市场中一些可用系统的规格,选择最适合伊斯兰堡的气候条件的风力涡轮机系统。 本文的目标是特别突出伊斯兰堡的潜力,以及巴基斯坦通常基于风能潜力生产电力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号