(1) The production of Nissan water is best when it is controlled at 0.2-0.8m~3 (2) The lower limit of the development thickness of the layer system combination is 5m, the maximum length of the development well section is 841.28m, and the number of combined mining layers should not exceed 8 layers.
展开▼