Performance Evaluation of The Blackout and Power Outages in Libyan Power Grid - Al-Zawia Combined Cycle Power Plant Case Study

机译:利比亚电网停电和停电的性能评估-Al-Zawia联合循环电厂案例研究

获取原文

摘要

Increasing electrical energy demand in modern lifestyle has made the world fully dependent on power systems. Therefore, secure the electric energy to homes, factories, hospitals, and to all government foundations is a strong need. In the last seven years, several major blackouts and outages were reported in the power system grid of all cities in western Libya. This paper aims to present the evaluate the operation of Al-Zawia Combined Cycle Power Plant “Al-Zawia CCPP” throughout the period of blackout to find out the main reasons behind the blackouts and outages. Also the suitable solutions of them are proposed. The research is done based on the data that collected from history of the recorded data in Al-Zawia CCPP. The collected data shows the amount of energy produced from Al-Zawia CCPP, the energy consumed by the customers, and the amount of power shortage. For full power conditions, the Al-Zawia CCPP should work with nine generating units. However, the results of the study show the inability of the Al-Zawia CCPP to operate with full power conditions, because three generators at least are out of service.
机译:现代生活方式对电能的需求不断增长,已使世界完全依赖电力系统。因此,非常需要为家庭,工厂,医院以及所有政府基金会提供电能。在过去的七年中,利比亚西部所有城市的电力系统电网均报告了几次重大停电和停电事故。本文旨在对整个停电期间的Al-Zawia联合循环电厂“ Al-Zawia CCPP”的运行情况进行评估,以找出造成停电和停电的主要原因。还提出了它们的合适解决方案。该研究是基于从Al-Zawia CCPP中记录的数据的历史收集的数据完成的。收集的数据显示了Al-Zawia CCPP产生的能量,客户消耗的能量以及电力短缺的数量。对于全功率条件,Al-Zawia CCPP应该与九个发电机组一起工作。但是,研究结果表明,Al-Zawia CCPP无法在满功率条件下运行,因为至少有三台发电机停止了工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号