The U.S. Navy is undertaking the design and construction of a super flood basin at the Portsmouth Naval Shipyard (PNSY) in Kittery, Maine. The super flood basin is a 3.5 acre basin in front of an existing dry dock that artificially raises the natural river water level. Originally constructed for World War Ⅱ era submarines, the floor of the Dry Dock 1 is too shallow for current operational requirements. Presently, the shipyard provides artificial ballast and is tidally restricted to less than a handful of days per month for docking and undocking evolutions at Dry Dock 1. For numerous reasons, these operations were not sustainable in the long term and the team considered many alternatives to address the challenge. This paper steps through the project including development of concepts, identification of design constraints, and design challenges. The current schedule has this project nearing completion by summer 2021.
机译:美国海军正在缅因州基特里的朴茨茅斯海军造船厂(PNSY)设计和建造一个超级洪水盆地。超级洪水盆地是在现有干船坞前的3.5英亩盆地,人为地提高了自然河流水位。干船坞1最初是为第二次世界大战时期的潜艇而建造的,其地板太浅,无法满足当前的作战需求。目前,该船厂提供人工压载物,在干船坞1上每月最多只能停靠几天,以进行停靠和取消停靠的演变。由于许多原因,这些操作从长远来看是不可持续的,因此该团队考虑了许多替代方案解决挑战。本文逐步完成了该项目,包括概念的开发,设计约束的识别和设计挑战。目前的时间表是,该项目将于2021年夏季完成。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号