Optimization Gas Turbine Balancing Methods to Increase Availability and Reliability with Case Study Gas Turbine Type MW701D in Gresik Combined Cycle Power Plant

机译:以Gresik联合循环发电厂的MW701D型燃气轮机为例,优化燃气轮机平衡方法以提高可用性和可靠性

获取原文

摘要

Gresik combined cycle power plant is one of PT Pembangkitan Jawa Bali’s units that has nine units of combined cycle power plant. The most common problems in Gresik combined cycle power plant is high vibration due to unbalance of the rotor within the gas turbine both during normal operation and after major inspection. Two plane balancing is required when there is an unbalance case. The problem faced is that the balancing process based on the existing method required a long time, the balancing process required a minimum of four stages; the original run, trial one run, trial two run, and correction run to resolve the unbalanced case. The time needed to perform the balancing process with the existing method is 35,75 hours. The long duration of the balancing process can cause PT PJB UP Gresik to lose production opportunities and experience a significant decrease in the EAF (Equivalent Availability Factor) value. Due to these problems, an optimization of balancing on a gas turbine has made by reducing the stage of the balancing process from four stages to two stages with eliminating the process of trial one run and trial two run so that the results of the implementation of this optimization can reduce the duration of the two plane balancing process by 23.5 hours, save costs by Rp1.183.145.312 and can prevent a decrease in the EAF value by 0.4%.
机译:Gresik联合循环发电厂是PT Pembangkitan Jawa Bali的单位之一,拥有9台联合循环发电厂。在Gresik联合循环发电厂中,最常见的问题是在正常运行期间和经过大检查后,由于燃气轮机内的转子不平衡而导致的高振动。发生不平衡情况时,需要两个平面的平衡。面临的问题是,基于现有方法的平衡过程需要很长时间,而平衡过程至少需要四个阶段。原始运行,一次尝试运行,两次尝试运行和更正运行以解决不平衡情况。使用现有方法执行平衡过程所需的时间为35,75小时。平衡过程的持续时间较长,可能会导致PT PJB UP Gresik失去生产机会,并且会导致EAF(等效可用性因子)值显着下降。由于这些问题,通过消除平衡过程的阶段从四个阶段减少到两个阶段,从而消除了一次试运行和两次试运行的过程,从而对燃气轮机的平衡进行了优化,从而实现了这一结果。优化可以将两平面平衡过程的持续时间减少23.5小时,节省Rp1.183.145.312的成本,并且可以防止EAF值减少0.4%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号