首页> 外文会议>International conference on hydropower;Waterpower'97 >Morning glory spillway repairs at kingsley dam
【24h】

Morning glory spillway repairs at kingsley dam

机译:金斯利大坝的牵牛花溢洪道维修

获取原文

摘要

Vertical cracks were discovered in some of the concrete columns of the morning-glory spillway at Kingsley Dam on the North Platte River. The cracks tended to separate the load-bearing interior portions of the column from the reinforced exterior portions, resulting in potential inward collapse of the structure at higher lake levels. The columns were repaired by the installation of anchor bolts, which provide horizontal reinforcement, re-establishing the columns as single load-bearing members.
机译:在北普拉特河金斯利大坝的牵牛花溢洪道的一些混凝土柱中发现了垂直裂缝。裂纹趋向于将立柱的承重内部与加固的外部分开,从而导致结构在较高的湖平面处可能向内坍塌。通过安装锚固螺栓对支柱进行修理,锚固螺栓可提供水平加固,将支柱重新建立为单个承重构件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号