首页> 外文会议>工业工程与系统管理2007年国际会议(International Conference on Industrial Engineering and Systems Management)(IESM 2007)论文集 >Cover-Time Planning,An alternative to Material Requirements Planning;with Customer Order Production Abilities and Restricted Work-In-Process
【24h】

Cover-Time Planning,An alternative to Material Requirements Planning;with Customer Order Production Abilities and Restricted Work-In-Process

机译:涵盖时间计划,物料需求计划的替代方案;具有客户订单生产能力和受限的在制品

获取原文

摘要

An alternative to the more commonly known Material Requirements Planning (MRP) is presented. The technique is based on a coverage analysis and is called Cover-Time Planning (CTP); CTP is in fact a reorder-point system, but with time instead of quantity as the decision variable. Similar to Kanban CTP restricts the total amount of an item but in the CONWIP way, not in every machine, but the total amount in stock and in the route from its components. Contrary to traditional reorder-point systems CTP uses the information in the bills of material to present forecasts for all possible component items. CTP shows inherent priority numbers and like MRP CTP makes it possible to estimate future work load. The main principle behind CTP is to wait as long as possible before production starts; to wait so that it is more exactly known what the customer asks for and by that avoid to tie up material and components in something that the customer will not ask for.
机译:介绍了更常见的材料需求计划(MRP)的替代方案。该技术基于覆盖率分析,称为覆盖时间计划(CTP); CTP实际上是一个重新排序点系统,但随着时间而不是数量作为决策变量。与Kanban CTP类似,限制物品的总量,但以CONWIP方式,而不是在每台机器中,而是从其组件的总量和路线中的总金额。与传统的重新排序点系统相反,CTP使用材料账单中的信息来为所有可能的组件项提供预测。 CTP显示固有的优先级编号,如MRP CTP可以估计未来的工作负载。 CTP后面的主要原则是在生产开始前等等;等待使其更加了解客户要求的内容和避免将材料和组件捆绑在客户不会要求的内容中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号