首页> 外文会议>Offshore Technology Conference(OTC 08): Waves of Change >Lessons Learned From the Openhole Completions in Two HP/HT Retrograde Gas Condensate Fields Using Expandable Liner Hangers, External-Sleeve Inflatable Packer Collars and Swellable Packers for Zonal Isolation
【24h】

Lessons Learned From the Openhole Completions in Two HP/HT Retrograde Gas Condensate Fields Using Expandable Liner Hangers, External-Sleeve Inflatable Packer Collars and Swellable Packers for Zonal Isolation

机译:使用可膨胀衬管吊架,外部套筒式充气封隔器和可膨胀封隔器进行分区隔离从两个HP / HT逆向凝析气田的裸眼完井中学到的经验教训

获取原文

摘要

Valuable lessons have been learned from the development of eight retrograde gas-production wells located in offshore Vietnam operated by the Korean National Oil Company. The intent of this paper is to share these lessons by presenting the concepts considered for well design, the selection process for the completion equipment and techniques, the preplanning for the installations, and the experiences encountered during the actual installations. The completion challenges included isolation of water production below the casing shoe and controlling condensate banking, sand production, and co-mingling multiple production zones in the long openhole sections. A different type of completion that involved an expandable liner hanger (ELH) with an external-sleeve inflatable packer collar (ESIPC) was chosen and installation and cementing were accomplished in a single trip. The ESIPC was deployed just below the water-producing zone, and cement was pumped up the annulus from the ESIPC to where the expandable liner hanger (ELH) was set above it. This would prevent water from entering the wellbore while enabling optimum production. To prove the concept, a stack-up test was done at surface before actual deployment on location to ensure that the cement wiper plugs would pass through the expandable-liner-hanger ball seat and that the concept would perform as intended. Swellable packers were selected from the various proven openhole isolation devices available to the industry to provide the zonal isolation required in the multi-zone intervals. This was the first openhole completion in Southeast Asia in a high-temperature, commingled gas environment in which isolation would be contained solely by swellable packers.
机译:从韩国国家石油公司运营的位于越南近海的八口逆向产气井的开发中,我们汲取了宝贵的经验教训。本文的目的是通过介绍考虑的井设计概念,完井设备和技术的选择过程,安装的预计划以及实际安装中遇到的经验,来分享这些经验教训。完井面临的挑战包括隔离套管鞋下方的水生产,控制凝结水库,出砂以及在长裸眼井段将多个生产区混合在一起。选择了一种不同类型的完井方法,其中涉及带有外部套筒可膨胀封隔器轴环(ESIPC)的可膨胀衬管悬挂器(ELH),并且安装和固井只需一次行程即可完成。 ESIPC部署在产水区的正下方,水泥从ESIPC向上泵入环空,并在其上方设置了可膨胀衬管吊架(ELH)。这将防止水进入井眼,同时实现最佳产量。为了证明这一概念,在实际部署到现场之前先在地面进行了堆叠测试,以确保水泥刮水器塞子能够通过可膨胀衬套-衣架球座,并且该概念能够按预期执行。膨胀封隔器是从工业上可用的各种成熟的裸眼隔离设备中选择的,以提供多区域间隔所需的区域隔离。这是东南亚第一个在高温,混合气体环境中进行的裸眼完井作业,在该作业中,隔离层仅由可膨胀封隔器控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号